Monday, January 4, 2010

We Interrupt this Renovation...

We interrupt this renovation for a sad case of strep throat. Poor hubby was working madly until Saturday evening when he called it a night. As is often the case with strep throat, it came on seemly out of nowhere with a high fever and sore throat. Totally knocked him for a loop. Thankfully he got into the dr. today and got some meds and will hopefully be on the road to recovery soon. Don't be looking for those drywalled pictures this week though. Taking Monday off is not going to translate into being able to take Friday off as well.

I guess I'll just have to be happy looking at this in the meantime...

huge batts of insulation waiting to be fitted between the joists


Saturday brought a big change in the temperatures as one layer of insulation was placed over the framing and all those dangling wires are roughed in electrical.


At least things are much warmer!

And I can always learn a little more patience.

Take care,

Julia

1 comment:

  1. So sorry this happened--both for your husband's sake and the renovation's! Strep throat is no fun--but since he's got the meds, he'll be better in no time! Excited to see the rest of your process!

    ReplyDelete

Thanks for stopping by Finding Beauty @ Home. And thanks for your lovely comments. I appreciate each one. Have a beautiful day!

Julia